Solar glint and glare, battery storage and associated planning issues.
A BESS stores electrical energy for later export or grid services. Planning issues can include site design, landscape and visual effects, noise, access, drainage, ecology, fire-safety evidence, emergency access, lighting, grid connection and cumulative effects.
The planning authority is not necessarily the regulator for every technical safety matter, but land-use consequences and the adequacy of information relevant to planning can still be material.
Sources and further information
GOV.UK: Environmental Impact AssessmentScottish Government: National Planning Framework 4Welsh Government: Planning Policy WalesDepartment for Infrastructure NI: Strategic Planning Policy Statement Edition 2Last checked: 25 September 2026
Identify the receptors and routes assessed.
Glint and glare work commonly considers nearby dwellings, roads, railways and aviation receptors where relevant. Check whether the study area and receptor selection are explained.
Check the panel assumptions.
Orientation, tilt, height, tracking behaviour and panel technology affect reflections. Ensure the model corresponds to the proposed design or a justified worst-case scenario.
Distinguish geometric possibility from assessed impact.
A model may identify times when reflection is geometrically possible and then consider duration, angle, screening and receptor sensitivity. Read beyond the initial result table.
Check screening carefully.
Existing vegetation may not provide year-round screening, while proposed planting takes time to establish. If mitigation relies on screening, identify its location, height, timing and securing mechanism.
For aviation, identify the relevant consultation evidence.
Do not assume every predicted reflection creates an aviation safety problem. Check the methodology, receptor type and responses from the relevant airport, aerodrome or aviation body where applicable.
Sources and further information
Scottish Government - Information to be included in an EIA Report
GOV.UK - Environmental Impact Assessment
Welsh Government / PEDW - Environmental Impact Assessment guidance
Last checked: 26 September 2026
← Back to Energy & Environmental Evidence
If you cannot find the answer you need, send a support ticket to the ObjectNow team.
We use cookies to help improve your experience on our site. By continuing to use the site, you agree to our use of cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
These cookies are needed for adding comments on this website.
Google reCAPTCHA helps protect websites from spam and abuse by verifying user interactions through challenges.
Marketing cookies are used to follow visitors to websites. The intention is to show ads that are relevant and engaging to the individual user.
Google Maps is a web mapping service providing satellite imagery, real-time navigation, and location-based information.
Service URL: policies.google.com (opens in a new window)
You can find more information in our Privacy Policy and Privacy Policy.